ISO/IEC JTC1/SC22/WG5 N1380 (Revised 24 July 2000) Preliminary Agenda Meeting of ISO/IEC JTC1/SC22/WG5 August 14-18, 2000 Technical Research Center of Finland University of Oulu, Finland Monday, August 14 0900 - 1745 Tuesday, August 15 0900 - 1745 Wednesday, August 16 0900 - 1745 Thursday, August 17 0900 - 1745 Friday, August 18 0900 - 1300 1. Opening of the Meeting: 9:00 am, August 14, 2000 2. Opening business 2.1 Introductory remarks from the Convenor 2.2 Welcome from the Host 2.3 Local arrangements 2.4 Appointments for this meeting 2.5 Adoption of the Agenda 2.6 Approval of the Minutes of the Cadarache Meeting [N1344a] 3. Matters arising from the minutes 4. Status of Cadarache Resolutions [N1343] 5. Reports 5.1 SC22 Matters (Convenor) 5.2 National Activity Reports (Heads of Delegations) 5.3 Report from Primary Development Body (NCITS/J3 Chair) 5.4 Reports from other Development Bodies (Editors/Heads) 5.5 Liaison Reports 6. Processing of interpretations 6.1 Construction of draft Corrigendum 1 to Fortran 95 6.2 Review of 'passed by J3 letter ballot' items 6.3 Provide assistance to J3 processing of other items 6.4 Process defect report (N1387) on 1539-3. 7. Review of Progress on Fortran 2000 (see N1382) 7.1 Primary Development Body Scheduling/Content Recommendations 7.2 Detailed Progress on Individual Requirements 7.2.1 Floating Point Exception Handling (as in TR 15580) 7.2.2 Allocatable Components (as in TR 15581) 7.2.3 Derived type I/O (R1) 7.2.4 Asynchronous I/O (R2) 7.2.5 Procedure pointers (R3) 7.2.6 Interval arithmetic enabling technologies (R4) 7.2.7 Parameterized derived types (R5) 7.2.8 Object Oriented technologies (R6) 7.2.9 Constructors/Destructors (R7) 7.2.10 Internationalization (R8) 7.2.11 Interoperability with C (R9) 7.2.12 Minor Technical Enhancements 7.3 Decide on Minor Technical Enhancements to be included or excluded 7.4 Prepare a summary of the changes from Fortran 95 7.5 Provide assistance to J3 re any item in the list of required contents that still needs technical work 8. Review of Fortran 2000 working draft 9. WG5 Business and Strategic Plans 9.1 Goals for 2000-2003 9.2 Business Plan for 2000 SC22 Plenary 10. Closing Business 10.1 Future meetings 10.2 Any other business 11. Adoption of Resolutions 12. Adjournment: 1 pm, August 18, 2000